Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Hangzhou Fuyang D&T Industry Co., Ltd.
Fuyang D&T Industry Co., Ltd. specializes in manufacturing sponge cutter, EPS cutter, PU foam cutter and CNC cutting machine.Our company takes advantage of a long experience achieved in foam industry, in a continuous technological research and in an accurate study of materials and new technology, so we can produce suitable cutting machine for you.
Place of Origin: | Zhejiang,China |
---|---|
Brand Name: | D&T |
Certification: | CE |
Model Number: | FDS930A |
Minimum Order Quantity: | 1 set |
Price: | USD 15000-50000 / Set |
Packaging Details: | Film + Woden Box |
Delivery Time: | 45 working days |
Payment Terms: | T/T, L/C, Paypal |
Supply Ability: | 20 sets / month |
Expansion Chamber Diameter: | Dn1100 | Expansion Chamber: | 1.0 M³ |
---|---|---|---|
Expansion Chamber Volume: | 1.4 M³ | Steam Entry: | 2’’(DN50) Inch |
Steam Consumption: | 6-8 Kg/Cycle | Steam: | 0.6-0.8 Mpa |
Compressed Air Entry: | 2’’(DN50) | Compressed Air: | 0.5-0.8 Mpa |
Drainage Upper Drain Port: | 4’’(DN100) | Drainage Lower Drain Port: | 3’’(DN80) |
Capacity (10g/l): | 320 | Capacity (15g/l): | 550 |
Capacity (20g/l): | 750 | Capacity (30g/l): | 850 |
Connected Load/Power: | 17.5 Kw | Expaned Density: | 10-40 M³ |
Density Tolerance: | ±3% | Overall Dimension(L*W*H): | 2900*4500*5900 Mm |
Weight: | 3200 Kg | ||
Highlight: | Batch Pre-Expander,foam expander,PLC Programmable Pre expander |
PLC Programmable Controlling High tolerance Bath Pre-expander less3% error
,
Feature:
The expanding process is the most important step in producing EPS cushioning
and thermal insulation material.
If large quantity and uniformity of products can be produced in unit time,
it will reduce costs of material and energy to a large extent.
To shorten cycler time, reduce steam consumption and produce high quality products,
it should choose pre-expander machine carefully.
This type of pre-expanding machine is designed with below-discharging,
which avoids material extrusion or deform of discharging door
and could save much more energy.
The material weighing system minimizes volume variations
through the use of a load cell and indicator.
A level master sensor maintains an exact rise of
expanding material reducing density variations through the expanding.
Heat controller is applied during discharge of the vessel to reduce water entertainment,
eliminating thermal shock and creating energy savings.
If there is an electrical interruption during the expansion cycle,
steams is cut-off and air is automatically aplied to the expander chamber,
preventing freezing up of EPS particles.
Our new advanced touch screen control system allows easy operation,
it also has self checking, warning, position indicating and troubleshooting system.
Application:
1. The machine adopts PLC programmable controlloer and
touch screen control,automatic feeding,
automatic electronic measurement,
automatic contorl of temperature and
pressure,dry barrel drums,etc.,
have made the material once completed,
to ensure that the machine automatically cycle of production.
2. The use of electronic weighing systems,
photoeletric material level control system,
proper grasp bulk density foam material,
so that a uniform density foam beads
after each error is less than 3% or less.
3. Barrel body temperature and vapor pressure,
the use of advanced high-precision Japanese pilt valve control,
ensure that the pressure relief valve outlet is always constant,
ensure that the temperature inside the tank advance machine control within ±1% °c of,
so as to ensure the consistency of raw EPS issued prevent EPS material
because the temperature control is not good agglomeration.
4. Automatic vacuum feeding device,
electronic weighing devices,
combined with level switch to achieve the automatic feeding,
improved production efficiency,reduce labor inensity.
5. The barrel constant use of closed foam,
high thermal efficiency,
save steam energy than the continuous
advance machines save more than 50%.
6. The aircraft is equipped with a high quality enclosed hot air drying system,
good raw material in the barrel body hair dry,
without going through along curing dry bed.
Weighing system on top of the barrel,
so the small footprint and compact machine structure.
7. The machine uses electrical,pheumatic components,valves,etc.
are well-known brand products,
thus ensuring the operation of the machine stability,reliability and long service life.
Automatic discharge barrel using compressed air to blow the material ,
increase the feed rate.
8. The computer has a memory function,
can often use the EPS raw material manufacture brands,specifications,foaming process,
all parameters can be recorded in the computer.
When you need to use the manufacturers of raw materials used in the past,
you just press a computer touch screen can quickly go back to the original process.
9. The machine is suitable for high altitude areas of foam production,
play a pressure foaming machines superiority
(In the same environment Continuous Pre machine productivity is very low.)
Technical Data:
Item |
Unit |
FDS1100B |
|
|
Diameter |
mm |
Dn1100 |
Volume |
m³ |
1.4 |
|
Usable Volume |
m³ |
1.0 |
|
|
Entry |
Inch |
2’’(DN50) |
Consumption |
Kg/Cycle |
6-8 |
|
Pressure |
Mpa |
0.6-0.8 |
|
|
Entry |
Inch |
2’’(DN50) |
Consumption |
m³/Cycle |
0.9-1.1 |
|
Pressure |
Mpa |
0.5-0.8 |
|
|
Upper Drain Port |
Inch |
4’’(DN100) |
Lower Drain Port |
Inch |
4”(DN100) |
|
Lower Drain Port |
Inch |
3’’(DN80) |
|
Material Conveying Line |
Inch |
6’’(DN150) |
|
|
10g/l |
320 |
|
15/g |
550 |
||
20g/l |
750 |
||
30g/l |
850 |
||
Connected Load/Power |
Kw |
17.5 |
|
Expaned Density |
m³ |
10-40 |
|
Density Tolerance |
% |
±3% |
|
Overall Dimension(L*W*H) |
mm |
2900*4500*5900 |
|
Weight |
Kg |
3200 |
Terms:
Validity: 60 days
Terms of Payment: 30% advance payment by T/T upon signing of sales contract
70% covered by confirmed irrevocable L/C by sight or T/T before shipping.
Delivery: 60 days after receipt of advance payment.
Installation and Start-up:
TWO technicians will be assigned to coordinate installation,
commissioning and training; cost for flight ticket,
suitable accommodation and
additional USD 100/day/each worker fee will be covered by Buyer,
Warranty: 12 months limited warranty
starting from date of arrival excluding wear parts.
Shipping cost for parts to be replaced during warranty
period have to be borne by the customer.